St. Joseph Hospital Center for Advanced Care

Project Summary

  • 10 stories and 380,000 square feet
  • 133,000 sf outpatient and clinic space
  • Cancer treatment center
  • 350-car parking garage
  • Pursuing LEED Gold Certification

Project Summary

  • 10 stories and 380,000 square feet
  • 133,000 sf outpatient and clinic space
  • Cancer treatment center
  • 350-car parking garage
  • Pursuing LEED Gold Certification

Project Highlights

Facilitated collaboration meetings among Presence Health and Hammes Company prior to project start to ensure that all stakeholders' needs were met. 

A 2.5 month potential delay due to weather conditions and a caisson redesign was mitigated by schedule revisions, allowing the project to be completed on schedule.  

Given the complexity of medical equipment, equipment manufacturers activities were integrated into the schedule. 

 

 

St. Joseph Hospital Center for Advanced Care

Client: Presence Health, Hammes Company

Designed to create a healing environment and provide coordinated patient and family care, the new center incorporates state-of-the-art diagnostic, treatment and smart building technologies.  Connected to the existing hospital via a glass sky bridge, the 380,000 sf, 10-story Center for Advanced Care features ambulatory care, medical office space, an orthopedic center, outpatient facilities and a comprehensive cancer center with radiation therapy, medical oncology, infusion therapy and holistic treatments.  In addition, the new Chicago Institute of Advanced Bariatrics is housed in the Center as well as women’s imaging suites that include 3T MRI, PET CT, low-dose mammography and digital x-ray. The first, fifth and sixth floors provide outpatient services featuring 30 exam rooms, 12 infusion bays, 36 pre/post patient rooms, 4 operating rooms, ultrasound rooms, GI labs, rehabilitation gym and procedure rooms. A new Walgreen’s pharmacy was constructed on the first floor. The 146,000 sf, 350-car parking garage is located on the lower three floors. 

The cast-in-place concrete structure is supported by 73' deep caissons and enclosed with curtainwall, architectural precast, metal panels, and punched windows. The west side is granite precast procured from Brazil. The 10th floor penthouse features 8 custom AHUs totaling 257,750 cfm and 1- 2,000 KW generator and 1- 2500 kVa generator. Special acoustic sound barriers were added to mechanical equipment to mitigate the noise for the surrounding neighborhood.

 

Project Highlights

Facilitated collaboration meetings among Presence Health and Hammes Company prior to project start to ensure that all stakeholders' needs were met. 

A 2.5 month potential delay due to weather conditions and a caisson redesign was mitigated by schedule revisions, allowing the project to be completed on schedule.  

Given the complexity of medical equipment, equipment manufacturers activities were integrated into the schedule. 

 

 

Sustainable Highlights

The project is designed for LEED Gold certification supported with recycled materials, regional materials, low VOC emitting materials, site selection, water efficient landscaping, design innovation and access to public transportation.

Power developed a plan to delay installation of protective exterior shielding and windows in a portion of the 6th floor enclosure to allow for installation of the complex MRI equipment through the opening.
Due to unpredictable water table and soils encountered during caisson construction, Power worked closely with the Owner and A/E to redesign the original caisson design and mitigate potential schedule delays to meet the original owner occupancy date.
Developed site logistics with hospital facilities staff and local neighborhood association to mitigate the impact of construction on deliveries, emergency vehicles and residential traffic.