Back to top
Client
United Airlines
Architect/Designer
Klein & Hoffman
Property Manager/Owner's Rep
JLL
City/Neighborhood
O'Hare International Airport

This complex renovation will replace the majority of glass located in the ceiling barrel vault roof, over-cladding of the barrel vault metal panels, replacement of flat and low sloped roofing, replacement of standing seam roofing, and joint sealants repair sat the perimeter glass façade at both Concourse B and C.  The work will be performed in the operating terminals and back of house areas for United.

Coordinating with 24/7 Operations

Construction will be carried out during regular daytime hours. The public on concourse level will be protected from the glass replacement operations by an OSHA compliant fall protection netting system with an additional layer of heavy duty debris protection netting.
 
This project is being completed concurrently with the United Terminal 1 HVAC Upgrades.  All work will take place during the pre-scheduled gate closures, moving through the terminal.