Stretching an entire city block, this 2.1 million sf, mixed-use development comprised of two residential towers (respectively 77-stories and 50-stories) connected by a ten-story podium and four levels of underground parking (820,000 gsf). It was constructed in a top-down method where the basement levels were simultaneously excavated as the towers rose above. By accelerating the vertical growth, our team reduced the schedule by eight months.
In total, the building features 735 rental apartments, 77 for-sale condominiums, 1,100 above and below ground parking spaces, 55,000 sf of offices, a restaurant, event space, a Whole Foods, a 125,000 sf Life Time Athletic Resort with an NCAA basketball court and four swimming pools, putting green, demonstration kitchen, multiple lounges, 120-foot-long elevated dog park, and a co-working space. Additionally, a 45,000 sf build-out of a Life Time Work features two floors of private offices, breakrooms, conference rooms and opening seating. Designed around a healthy work-life, with luxuriously appointed spaces featuring live plants, natural light, ergonomic workstations, healthy food and beverage offerings, membership also includes a Life Time Fitness membership, making it the first and only co-working concept that combines exceptional spaces with a world-class health club experience.
At the top of the taller tower are two liquid mass damper tanks which mitigate the effects of building sway for residents.